
Metal Building Contractors in Fort Worth, TX
Veteran-owned metal building construction throughout Fort Worth and the DFW Metroplex. Custom steel buildings, warehouses, workshops, and industrial facilities engineered for Tarrant County — from Alliance to I-35W and beyond.
Building Types
Metal Building Types We Offer in Fort Worth
Custom steel structures engineered for North Texas — every building designed to your specifications and Fort Worth-Tarrant County code requirements.
Commercial Metal Buildings
Retail storefronts, auto dealerships, office buildings, and franchise locations for Fort Worth's commercial corridors — from the Cultural District to Alliance and I-35W.
Shops & Garages
Personal workshops, hobby garages, and multi-bay shops engineered for Tarrant County homeowners — built to your exact dimensions with insulated panels and roll-up doors.
Warehouses & Storage
Clear-span distribution centers, cold storage, and industrial facilities along the I-35W and Alliance corridors — from 10,000 to 200,000+ sq ft.
Pre-Engineered Metal Buildings (PEMB)
Pre-engineered kits, barndominiums, agricultural structures, and custom steel frames for Tarrant County and surrounding North Texas properties.
Fort Worth & Tarrant County Permitting — We Handle It
Most metal buildings inside Fort Worth city limits need a building permit from the City of Fort Worth Development Services; small detached accessory buildings may be exempt under the city's adopted code. Outside city limits, Tarrant County generally has no general building-permit authority; county permits there are limited to items such as floodplain development, on-site sewage (septic), driveway access and, in some counties, fire-code permits for commercial buildings. Fort Worth builds to the 2021 I-codes with the 2015 IECC for conditioned buildings, and some Alliance corridor properties fall under specific PID (Public Improvement District) design standards. Additional permits may be needed for electrical, plumbing, HVAC, and fire suppression.
UTS BuildPros manages the entire Fort Worth and Tarrant County permitting process — from plan submittal and energy compliance review through all required inspections. We plan for the site-specific ASCE 7 wind design, expansive clay soil foundations, and the differences between Fort Worth city limits and unincorporated Tarrant County.
Call for a Free Permitting ConsultationService Coverage
Serving Fort Worth & Nearby Communities
UTS BuildPros delivers metal building construction throughout Tarrant County and the DFW Metroplex.
Arlington
Haltom City
Keller
North Richland Hills
Grapevine
Southlake
Benbrook
Saginaw
Watauga
White Settlement
Portfolio
Metal Building Projects Near Fort Worth
A sample of our completed steel structures across Fort Worth and Tarrant County — every project built to local code.
CommercialAlliance Corridor Warehouse – Fort Worth, TX
60,000 sq ft
CommercialAuto Dealership – Haltom City, TX
22,000 sq ft
CommercialIndustrial Facility – Fort Worth, TX
45,000 sq ft
WorkshopCustom Workshop – Keller, TX
2,800 sq ft
CommercialRetail Strip – Benbrook, TX
14,000 sq ft
CommercialEquipment Depot – Saginaw, TX
18,000 sq ft
FAQ
Fort Worth Metal Building FAQs
Common questions about metal building construction, permits, costs, and timelines — for Fort Worth and Tarrant County.
Do I need a permit for a metal building in Fort Worth?
Usually. Most construction inside city limits needs a permit; small detached accessory buildings may be exempt under the city's adopted code — confirm with the city. Fort Worth requires plan review, zoning verification, and inspections at foundation, framing, MEP, and final stages, and builds to the 2021 I-codes with the 2015 IECC (see the City of Fort Worth building and energy codes page). Outside city limits, Tarrant County generally has no general building-permit authority; county permits there are limited to items such as floodplain development, on-site sewage (septic), driveway access and, in some counties, fire-code permits for commercial buildings. UTS BuildPros manages permitting on our Fort Worth projects.
How much does a metal building cost in Fort Worth and Tarrant County?
Turnkey metal building projects in Fort Worth and Tarrant County range from $60–$150 per sq ft all-in. A 30x40 workshop averages $72K–$120K; a 40x60 large shop averages $144K–$240K; a 5,000 sq ft commercial space averages $400K–$750K; a 40,000 sq ft Alliance corridor warehouse averages $2.4M–$4.8M. DFW Metroplex labor rates and Fort Worth's expansive clay soils may add $3–$8 per sq ft to foundation costs — we factor this into every estimate. Be skeptical of shell-only pricing: the all-in cost is typically 3–4x the shell price.
What sizes of metal buildings do you build in the Fort Worth area?
We build from a 20x20 garage to a 200,000+ sq ft distribution center. Popular Fort Worth-area sizes: 30x40 workshops, 40x60 large shops, 10,000–60,000 sq ft warehouses for the Alliance corridor, and 100,000+ sq ft industrial facilities. Clear-span steel allows column-free interiors up to 200+ feet — ideal for distribution centers, manufacturing, and any application requiring unobstructed floor space.
How long does it take to construct a metal building in Fort Worth?
Timeline depends on size, complexity, and permit approval speed. A residential workshop (1,200–3,000 sq ft) typically takes 8–16 weeks total. A commercial building (5,000–15,000 sq ft) runs 4–8 months. Large industrial warehouses (40,000+ sq ft) take 6–12 months. Permit review time varies with the project and how complete the submittal is; Texas law (Local Gov't Code §214.904) generally requires a city to approve or deny a building permit within 45 days, with one 30-day extension by written notice. Steel erection is roughly twice as fast as wood framing.
What is the difference between a metal building shell and a turnkey building?
A metal building shell is the structural envelope only — frame, wall panels, roof panels, and basic doors. It excludes: foundation ($8K–$65K+), erection labor ($5–$15/sq ft), insulation ($3–$8/sq ft), electrical ($5–$15/sq ft), permits and engineering ($3K–$15K+), interior finishes, and HVAC. The all-in turnkey price is typically 3–4x the shell price. We quote turnkey pricing from day one.
Can I expand my metal building later?
Absolutely. Pre-engineered metal buildings have non-load-bearing end walls by design. To expand, you remove the end wall panels, extend the foundation, and bolt on additional bays. Expansion typically costs 40–60% less per sq ft than ground-up construction. For Alliance corridor industrial tenants and Tarrant County businesses planning multi-phase growth, this flexibility eliminates the need to overbuild today.
How do your steel buildings handle DFW weather — heat, storms, and clay soils?
All structures are designed by licensed Texas engineers to meet local wind, snow, and soil requirements. Fort Worth buildings are designed to the site-specific design wind speed under ASCE 7 (check your parcel on the ASCE Hazard Tool, https://ascehazardtool.org/). For DFW summer heat, closed-cell spray foam insulation (R-7 per inch) combined with reflective radiant barriers reduces cooling loads by 25–35%. For Fort Worth's expansive clay soils, we engineer foundations with proper pier depth, moisture barrier systems, and soil stabilization where needed. Galvalume-coated steel panels carry 25–40 year warranties and outperform traditional roofing in hail resistance.
Free Quote
Request a Metal Building Quote in Fort Worth
Tell us about your project and we will follow up within one business day with a detailed estimate at no cost.
